Phinisi Fleet Maintenance Reliability Program

A three-vessel phinisi operation moved from reactive repair culture to weekly reliability close with structured failure taxonomy and parts-risk matrix.

Unplanned downtime hours

-34%

Preventive compliance

+22 pts

Technical cancellation rate

-41%

What changed

  • One shared failure taxonomy across engineering shifts.
  • Engine-hour preventive scheduling with overdue escalation.
  • Critical-parts thresholds tied to route risk and lead time.
  • Weekly close cadence with owner-per-exception model.

Execution timeline

Window Milestone
Day 1-21Taxonomy setup and historical failure normalization
Day 22-45Preventive cadence activation and backlog cleanup
Day 46-90Reliability close governance and dispatch risk reduction